Skip to content
MBPS documentation

A little clarity goes a long way.

Everything you need to understand the network and explore the prototype.

Nodes

Your part of the network.

Capacity tiers

Choose 100, 200, 300, 400 or 500 Mbps. Activation consumes the matching simulated USDC amount. No real infrastructure is reserved.

Activation and replacement

Review capacity, cost, asset and balance. Replacing a plan starts a new cycle; previously claimed credits stay in the wallet.

Node status

Activation shows an online sample node. Production status would require a running client, connection quality and uptime checks. This prototype does not perform them.